SAMPLE: Nine steps from pre-approval to keys
22 September 2026 · 6 min read · Tasneem (Taz) Khajanchi
Sample content. Walk through each step in order, with the paperwork needed and the usual timing.
Pre-approval
What the lender asks for and how long the rate hold lasts.
Closing costs
Land transfer tax, legal fees, title insurance, adjustments. Give the real arithmetic.